Specialist Project Planning Services
for
Construction and Engineering Organisations
Time Location Reporting
Schedule Risk Analyses
Graphical Path Planning
Latest article/news
Primavera P6 Fill Down
A quick tip on a P6 Feature that may save some time and effort If you use P6 frequently, you've probably used the Fill Down (or CNTRL+E) option when populating data within columns in various P6 Views and Layouts such as Activity, Projects, WBS, Resources or Resource...
6th Annual Netpoint and GPM Conference
Australasian Project Planning was represented at the 6th Annual Netpoint and GPM user conference in New Orleans, USA. Santosh Bhat presented on Time-Location Reporting and the features of Netpoint that enable effective reporting for Linear Projects. The published...
Project Planning, Scheduling & Project Controls Events
The following is a (non-exhaustive) list of industry and discipline events that are relevant to Project Planning and Scheduling compiled by Australasian Project Planning. If you'd like to include a suitable event on this list, use our contact form to let us know....