by Santosh Bhat | 10 Feb, 2016 | Planning
The following is a (non-exhaustive) list of industry and discipline events that are relevant to Project Planning and Scheduling compiled by Australasian Project Planning. If you’d like to include a suitable event on this list, use our contact form to let us...
by Santosh Bhat | 5 Jan, 2016 | Planning
Overview This post provides methods of allocating time contingency, that may be useful when constructing or reviewing project schedules. Note – guidance in determining time contingency values is beyond the scope of this article. Contingency vs Float For the...
by Santosh Bhat | 26 Nov, 2015 | Planning
A timely LinkedIn post by Kul Bhushan Uppal, served as a reminder on the purpose of schedule levels and issues around the use of these. What are Schedule Levels? AACEi Recommended Practice (RP) 27R-03 – Schedule Classification System, provides a useful...
by Santosh Bhat | 13 Aug, 2015 | Planning
This article provides a brief overview and a downloadable reference card on Primavera P6 Views and Layouts. Overview In a previous post on Activity Codes in P6 , it was suggested that using Activity Codes could take up an entire day of Primavera Training, Another...
by Santosh Bhat | 3 Aug, 2015 | Graphical Path Method, Planning